HDZS6216 Double Deck Shale Shaker Ready for Shipment to Turkmenistan Oilfield Project
New Batch of Sand Pumps Successfully Manufactured and Shipped to Baoji
Two Double Deck Mud Shale Shakers Completed and Ready for Shipment to Kazakhstan Oilfield Project
3 Sets of FPGY150 Horizontal Flare Ignition Devices Delivered to Nigeria for Oilfield Application
Rig Tank: Essential Equipment for Modern Drilling Operations
| Availability: | |
|---|---|
| Quantity: | |
Product Description
Cross head is a key parts, the mud pump power end cross sliding in the upper and lower guide plate at work, push rod will be to hydraulic power transfer in the middle. Cross head fixed at the end of the middle lever, in the cavity through the crosshead pin attached to the small end of the connecting rod. Cross the materials for the tensile strength is greater than 600 mpa of nodular cast iron, ensure the high strength and abrasion resistance.
