| Availability: | |
|---|---|
| Quantity: | |
Product Description
HGM Rig mats is a new type of steel and wood structure rig mats according to the needs of well site developed, the rig mats to replace the traditional concrete foundation , and greatly reduces the drilling cost , improve the economic efficiency , saves the land , and raise the level of the site management.

Model | Length | Width | Thickness | Weight |
HGM301 | 3000mm | 2000mm | 160mm | 720kg |
HGM401 | 4000mm | 2000mm | 160mm | 960kg |
HGM501 | 5000mm | 2000mm | 160mm | 1200kg |
HGM601 | 6000mm | 2000mm | 160mm | 1440kg |
HGM1201 | 12000mm | 2000mm | 160mm | 2880kg |
HGM302 | 3000mm | 2000mm | 210mm | 900kg |
HGM402 | 4000mm | 2000mm | 210mm | 1200kg |
HGM502 | 5000mm | 2000mm | 210mm | 1500kg |
HGM602 | 6000mm | 2000mm | 210mm | 1800kg |
HGM1202 | 12000mm | 2000mm | 210mm | 3600kg |

The product has high strength, strong bearing capacity, good interchangeability, convenient transportation, low cost, convenient and quick installation, strong shock absorption, no cracking, no fear of water, corrosion resistance, no deformation, long service life, easy to recycle and store, etc. advantage.


Suitable for ZJ20, ZJ30, ZJ40, ZJ50, ZJ70 each drill in drilling depth in the plains of 1000-7000 - m, plateaux, deserts, hills, beach, different areas, such as swamp.

HL Petroleum comprehensively considers the on-site use environment and experience, and designs steel-wood foundations that are known for their flexibility and practicality. The drilling rig mattings we produce can be spliced together to a large area, which is easy to install.
![]() | ![]() |
| Step 1: Place the first mat as shown in the picture | Step2: Place the second mat horizontally, and alignthe male buckle of the second mat with the femalebuckle of the first mat |
| ![]() |
| Step 3: Adjust the gap and insert the positioningpin from the gap in the first female buckle | Step 4: Place the third mat on the other side of thefirst. Align the third piece of female buckle with thefirst mat male buckle and insert the positioning pin |
![]() | ![]() |
| Step 5: Place the fourth mat vertically on the end faceof the first one, align the male buckle end of the fourthmat with the female buckle end of the first mat, and insert the positioning pin | Step 6: Place the fifth mat vertically on the end face ofthe first mat, align the end face of the female buckle ofthe fifth mat with the end face of the male buckle ofthe first mat, and insert the positioning pin |
Sales: HL Petroleum
E-mail: sales@hlshiyou.com