Welcome to HL Petroleum Equipment Co., Ltd.
NEWS
All equipment produced by HL Petroleum has undergone strict inspections and overloaded operation tests before leaving the factory.
Home » Company News » HDZS6216 Double Deck Shale Shaker Ready for Shipment to Turkmenistan Oilfield Project

PRODUCT CATEGORY

CONTACT US

    Mob: +86-13735815206
    Email: sales@hlshiyou.com
    Address: 804# 1st Building, Western Cloud Valley 2nd Phase, Xi Xian New District, Xi‘an City, China
contact us

HDZS6216 Double Deck Shale Shaker Ready for Shipment to Turkmenistan Oilfield Project

Views: 0     Author: HL Petroleum     Publish Time: 2026-08-14      Origin: Site

Recently, one HDZS6216 Double Deck Shale Shaker manufactured by our company has successfully completed production, assembly, testing, and final inspection. The equipment is now ready for shipment to a Turkmenistan oilfield project, where it will serve as an important component of the drilling fluid solids control system.

As one of the primary solids control units in a drilling fluid circulation system, the HDZS6216 is designed to efficiently remove drilled cuttings from drilling mud at the first stage of solids separation. Its double-deck screening configuration provides a larger effective screening area and enables efficient separation under demanding drilling conditions.

High-Efficiency Double Deck Design for Drilling Fluid Separation

The HDZS6216 adopts an elliptical vibration trajectory, providing effective movement and separation of drilling cuttings across the screen surface. With a total screening area of 6.2 m² and a maximum processing capacity of ≥40 L/s, the shaker is well suited for continuous drilling fluid processing.

The equipment is equipped with frame-type screens with a mesh range of 40–210 mesh, allowing the screening configuration to be selected according to different drilling formations, mud properties, and solids-control requirements.

The screen box angle can also be adjusted from -1° to +4°, allowing operators to optimize solids conveyance and screening performance according to actual operating conditions.

HDZS6216 Technical Specifications

Parameter

Specification

Model

HDZS6216 Double Deck Shale Shaker

Vibration Trajectory

Elliptical

Screen Type

Frame Screen

Screen Size

16-650 × 600 mm

Screen Mesh

40–210 mesh

Effective Screening Area

6.2 m²

Motor Power

2 × 3.0 kW

Exciter Speed

1500 r/min

Vibration Frequency

25 Hz

Vibration Amplitude

≥5.5 mm

Vibration Intensity

≥6 g

Screen Box Angle

-1° to +4°

Mud Processing Capacity

≥40 L/s

Power Supply

AC 380 V, 50 Hz

Overall Dimensions

3165 × 2110 × 1775 mm

Total Weight

3950 kg

Explosion-Proof Rating

ExdⅡBT4

Electrical Protection

IP55

HDZS6216 Double Deck Shale Shaker

Stable Spring-Mass Vibration System

The HDZS6216 consists mainly of the base assembly, screen box assembly, screen box angle adjustment assembly, anti-splash assembly, mud box assembly, and electrical control system.

The screen box is supported by four rubber springs mounted on the left and right beams of the angle adjustment assembly. This structure forms a typical spring-mass vibration system, helping maintain stable vibration during continuous operation.

The optimized vibration structure enables the shaker to effectively transport drilled cuttings across the screening surface while separating solids from drilling fluid. This helps reduce the solids burden on downstream equipment and contributes to improved overall solids control performance.

Built for Challenging Oilfield Conditions

The equipment being delivered to Turkmenistan is designed to operate reliably in demanding oilfield environments.

The HDZS6216 features an ExdⅡBT4 explosion-proof configuration and IP55 electrical protection, providing suitable protection for oilfield drilling applications.

Its specified operating conditions include an ambient temperature range of -40°C to +50°C and relative humidity of up to 95%, allowing the equipment to adapt to a wide range of field conditions.

These characteristics make the HDZS6216 particularly suitable for applications where equipment reliability, continuous operation, and safe electrical performance are essential.

Strict Manufacturing and Pre-Shipment Inspection

To ensure reliable operation at the customer's project site, the shaker underwent a series of manufacturing and quality-control procedures before shipment.

The inspection covered the main structural components, screen box assembly, vibration system, electrical control system, screen installation, overall dimensions, and operating performance. After final assembly and testing, the equipment passed the factory acceptance inspection and was approved for shipment.

The completed HDZS6216 will now be transported to the Turkmenistan oilfield project, providing the customer with an efficient solution for drilling fluid solids separation.

Expanding Our International Solids Control Equipment Services

With extensive experience in the design and manufacture of drilling fluid processing equipment, our company provides a comprehensive range of oilfield solids control equipment, including shale shakers, mud cleaners, desanders, desilters, vacuum degassers, mud agitators, sand pumps, jet mud mixers, mud mixing hoppers, mud tanks, and complete solids control systems.

The successful completion of this HDZS6216 Double Deck Shale Shaker further demonstrates our manufacturing capabilities and commitment to supplying reliable equipment for international drilling projects.

We look forward to supporting more oil and gas drilling projects in Turkmenistan, Central Asia, and other international markets with high-quality solids control equipment and professional technical solutions.

CONTACT US
Phone/Wechat/Whatsapp: +86-13735815206
804# 1st Building, Western Cloud Valley 2nd Phase, Xi Xian New District, Xi‘an City, China
OUR PRODUCTS
HOT SELLING
FOLLOW US
Copyright © 2010-2021 HL PETROLEUM CO., LTD. Technical Support : sdzhidian