HL Petroleum Exports 4 Sets of 30m³ Mixing Water Tanks to Indonesia
HDZS6216 Double Deck Shale Shaker Ready for Shipment to Turkmenistan Oilfield Project
New Batch of Sand Pumps Successfully Manufactured and Shipped to Baoji
Two Double Deck Mud Shale Shakers Completed and Ready for Shipment to Kazakhstan Oilfield Project
Views: 0 Author: hmudcleaning Publish Time: 2023-04-24 Origin: Site
Recently, a batch of shear pumps and jet mixing funnels prepared by Xi'an HL for customers have been completed and are ready to be sent to the use sit
Xi'an HL mainly produces solids control equipment such as mud vibrating screens, desanders, desilters, centrifuges, and drilling cuttings dryers, and solids control related products such as sand pumps, shear pumps, jet mixing devices, jet mixing funnels, Electronic ignition devices, liquid-gas separators, diesel ignition devices, etc. are also deeply recognized by the majority of users.
The shear pump and jet mixing funnel are shipped this time, and the production cycle is one week. Shipment after passing the inspection in the factory.
Xi'an HL mainly produces solids control equipment such as mud vibrating screens, desanders, desilters, centrifuges, and drilling cuttings dryers, and solids control related products such as sand pumps, shear pumps, jet mixing devices, jet mixing funnels, Electronic ignition devices, liquid-gas separators, diesel ignition devices, etc. are also deeply recognized by the majority of users.
The shear pump and jet mixing funnel are shipped this time, and the production cycle is one week. Shipment after passing the inspection in the factory.
Xi'an HL mainly produces solids control equipment such as mud vibrating screens, desanders, desilters, centrifuges, and drilling cuttings dryers, and solids control related products such as sand pumps, shear pumps, jet mixing devices, jet mixing funnels, Electronic ignition devices, liquid-gas separators, diesel ignition devices, etc. are also deeply recognized by the majority of users.
The shear pump and jet mixing funnel are shipped this time, and the production cycle is one week. Shipment after passing the inspection in the factory.